AMC Projects Current and Past

CLIENT PROJECT PACKAGE DATES
ASC RAN submarine maintenance Boat repair and upgrades Ongoing
NSM RAN ANZAC Class Frigates Vessel repairs and upgrades Ongoing
Sandvik Mining and Construction RioTinto Amrun project (Civmec) Alumina shiploader, reclaimer and stacker fabrication, assembly and load out 2017
Civmec RioTinto Amrun project Process modules fabrication, assembly and load out 2017
ThyssenKrupp Industrial Solutions (Australia) Port Kembla Cole Terminal

Coal reclaimer and 3 stackers

 

2016 - 2017
BAE Woodside Julimar (EMAS Chiyoda) Subsea spool manufacture and load-out 2016
BAE Woodside Persephone WP3 (Subsea 7) Subsea spool manufacture and load-out 2016
Civmec Shell Australia Prelude FLNG (TechnipFMC) Subsea spool manufacture and load-out 2016
Schneider Electric (Australia) Chevron Wheatstone LNG 13 prefabricated substations, 9,000sqm floor area 2014 - 2016
AGC Chevron Gorgon LNG Project (Subsea 7) Subsea spool manufacture and load-out 2014 - 2015
Chevron Australia Gorgon and Wheatstone LNG Logistics and supply base to support projects 2011 - 2016
CBI Kentz Joint Venture Chevron Gorgon LNG project Vessel dress out, structural and pipework assembly 2011 - 2015
Leighton Contractors Chevron Gorgon LNG project Civils and Underground assembly 2011 - 2012
ThyssenKrupp Industrial Solutions (Australia) BHPBIO Iron ore stackers(2) and Reclaimer 2011 - 2012
ThyssenKrupp Industrial Solutions (Australia) Fortescue Metals Group Iron ore reclaimers (2) 2011
Saipem Leighton Consortium Chevron Gorgon LNG Product Loading Concrete caisson manufacture, fit-out and load-out 2010 - 2012
AGC Woodside Pluto Accommodation module 2009
Monadelphous RioTinto Fit-out of wharf modules 2008
Sandvik Mining and Construction RioTinto East Intercourse Island and Cape Lambert Two ship-loaders fabrication, assembly and load-out 2008
Thiess (CIMIC) FMG Wharf and conveyor assembly 2007
Hanseatic Super yachts Continuous build of 5 super yachts 2005 to present