Past Projects

Past Projects

Following are some of the many projects that have been successfully completed at the Common User Facility (CUF) since it was officially opened in 2003.

2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003

2011

Boskalis Australia: Docking and maintenance of rock barge Bluefin 2 
Boskalis Australia: Docking and maintenance of rock barge Bluefin 4 
Guardline Australia: Re-engine and trials for ACV Triton 
Strategic Marine: Docking and maintenance of Gorgon Armoured 7 Project barge (inspection/survey/repair) 
FH Bertling: Storage of Western Australian manufactured mills shells for Peruvian mine 
Alltrans Management: Defence overseas operations equipment staging and despatch 
Phillips Engineering: Carnegie Wave Energy buoy deployment 
Strategic Marine: Docking and maintenance of Gorgon Teras 281 Project barge (inspection/survey/repair) 
Total Marine Technology: Open water wet test of sonar tool for offshore pile surveys 
Clipper Pearls: Maintenance of Tina B at CUF North Jetty 
AGC: Assembly of Woodside Pluto flare tower 
ThyssenKrupp Materials Handling: Assembly of reclaimer boom FMG RC702 
P&O Maritime Services: Engine overhaul and general maintenance of MV Southern Supporter 
Hako Offshore: Docking and maintenance of rock barge Bluefin 2 
Neptune Fabrication Services: Fabrication and load-out of subsea spools 
CBI Constructors: Gorgon LNG tank component staging/quarantine inspection and despatch 
ThyssenKrupp Materials Handling: LIHIR gold mine crushing plant – staging prior to shipping 
NT Shipping: Modifications and refurbishment to GeoSea 
Ocean Technix: Remora condition assessment 
Holcim Australia: Assembly of portable concrete batch plant for Chevron Gorgon Barrow Island 
Boskalis Australia: Docking/transfer to hardstand and undocking of crane barge Goomai for upgrade and overhaul 
Boskalis Australia: Storage of 400,000 tonnes of rock and transport to Barrow Island for Gorgon causeway and MOF construction
Cimeco: Fabricate, blast, paint, fit-out accommodation camp tanks

^Back to top

2010

Unirig: Preliminary testing of Carnegie Wave Energy buoy anchoring system
Sabre Cats: Transport of vessel Babel to shiplift
NT Shipping: Modifications and refurbishment to Geo Atlantic
Cameron Subsea: Use of Building 10 as Commissioning Facility
BAE Systems: Docking and maintenance of DOF vessel Geosea
Freo Machinery: Build/commission/test 650 tonne Manitowoc ringer crane
Austal Ships: Docking and underwater hull maintenance of ship no 270 101 metre trimaran
Tideway Offshore Contractors: Load-out of rock for Alkimos Wastewater Outfall Line
Southern Seawater Alliance: Transport of discharge towers from Civmec to AMC wharf

^Back to top

2009

Carnegie Wave Energy: Mobilisation of jack-up barge Sirius for piling program
Monadelphous: Worlsey Alumina Expansion Program conveyor and gallery assembly
Kuehne Nagel: Mobilisation of cargo barge for Woodside Pluto accommodation module
Port Hedland Port Authority: Erection of shiploader, transport and load-out
NT Shipping: Modifications and refurbishment to Geo Atlantic
Nomad Portable Buildings: Final fit-out and storage of KBR/BHP site accommodation units
ThyssenKrupp Materials Handling: Stacker ST620 pre-assembly FA209/FC117
AGC: Assembly of Woodside Pluto accommodation module

^Back to top

2008

AGC: Crane assembly, testing and training
AGC: Fabrication of process tanks for transportation
AGC: 2,000 tonne jacket and topside assembled for Blacktip
ASC: Opens its new $35 million submarine repair and maintenance facility
Georgiou Group: Transfer and lay-by wharf
Monadelphous: Fit-out of wharf modules for Rio Tinto
Strategic Marine: Ship maintenance at AMC’s eastern wharf
ThyssenKrupp: Ore stacker assembly
TS7: Subsea pipe spool fabrication and assembly

^Back to top

2007

BESTBAReinforcements: Storage of steel reinforcing bars
Ferguson Seacabs: Service and supply base for Australasia
FMC Technologies: Subsea maintenance/aftermarket facility opens for business
Hanseatic Marine: Construction of a series of 70+ metre SOLAS vessels
Nomad Consolidated: Demountable assembly and storage
Thiess: Wharf and conveyer construction for FMG

^Back to top

2006

Commercial tanker conversion to HMAS Sirius
Tutt Bryant Crane Hire: Assemble Australia's largest non-superlift, non-ringer crane
AGC: Fabrication of biodiesel refinery
AGC: Assemble and load-out modules for Dampier wharf extension project
Alinta: Storage for Dampier to Bunbury pipeline expansion project
AGC: Jacket for New Zealand’s Pohokura gas field

^Back to top

2005

ANZAC Alliance: Planned maintenance, upgrade and modification to HMAS Arunta and HMAS Anzac
Royal Equipment: Refit of 17 coal trucks for Indonesia
Paramount: Laydown storage for Burrup Fertiliser ammonia plant
AGC: John Brookes topside for Apache Energy
Voest-Alpine: Iron ore shiploader for Rio Tinto

^Back to top

2004

P&H MinePro/Krupp Australia: Product stacker for Comalco
New Zealand warship berthed overnight
AGC: Woodside modules for Goodwyn A
Cryeng: 245,000 litre cryogenic tanks for HIsmelt
AGC: Linda platform for Apache Energy
Barwil Agencies Australia: MV Turicum berths for repair
Fraser Diving: Launch and recovery exercises

^Back to top

2003

Saipem: Semac barge - Australia's largest construction vessel

^Back to top